Quotation
Per job Costing
Our costing/estimating software system takes information from the design plans and our extensive Bill of Materials Library to complete an accurate quotation first time.
Changing the quotation Value up or down requires a design Plan change first, and that’s OKAY!
Terms and Conditions
Will be included with Quotation
Requirements Included but not limited to are:
Requirements Included but not limited to are:
- Clean Site - all debris and building materials to have been removed
- Soil level needs to be roughly 30mm below hard fixtures
- The land needs to be gently sloping away from the house to assist with water run off and drainage.
- Ensure the builder has provided a cut-in with valve to the water mains
- Ensure the builder has provided an external power point close to the house front
- Ensure the builder has provided a 90mm PVC Pipe under the driveway
- Booking Schedule Terms include a deposit
- Job start Schedule Terms include a payment
- Completion inspection Terms include the final payment
- The terms and conditions will be included with your quotation for your review.